Featured Projects
A curated selection of projects that define our expertise. Each one tells a story of collaboration, innovation, and tangible success.
GDS System Design & Installation for LANXESS AND CIPLA
- Design and install a Gas Distribution System (GDS) for inert gases (Helium,
Hydrogen, Nitrogen, Compressed Air) in their R&D lab.
- Gas bank on the 1st floor needed to supply gases to 5 labs on the 3rd floor
while maintaining consistent pressure and dry air (moisture-free CA).
- Space constraints and tight deadlines.
Our Work:
- Custom-designed a multi-floor GDS layout to ensure safe, efficient gas delivery
from the 1st-floor gas bank to the 3rd-floor labs.
- Engineered pressure stability solutions to account for vertical gas transfer
challenges.
- Streamlined installation within the limited timeline.
Key Achievements:
- Successfully delivered JK’s first GDS project, setting a benchmark for future
installations.
- Overcame space and time constraints with innovative design and execution.
- Gained hands-on expertise in high-pressure gas systems, enhancing team capabilities.
Client satisfaction:
- LANXESS commended the seamless setup and performance.
DSV Samudra Prabha (HAL offshore)
Client Requirements:
- Testing, cleaning, and inspecting Keller Bottles.
- Hydrotesting & pneumatic pressure testing for pressurization components.
- BOP Station System testing (corrected from "Beit Saturanion").
- Calibration of Safety Relief Valves (SRV).
- Expansion tests on various equipment.
Our Work:
- Hydrotesting conducted with specialized equipment, properly calibrated pressure gauges, and siphon tubes for autoregulation of excess gases.
- Cleaning of the internal surface of Kelly bottles using high-pressure nitrogen gas and water jetting.
After cleaning, we undergo a drying process of the internal surface as helium gas is present inside the Kelly bottle during operation.
- Expansion test of various equipment using the Macromantic® principle with an 800 L manometer tube and high-pressure jetting pump.
- After successful completion of all tests, ultrasonic thickness testing is performed to verify the actual shell thickness.
- Painting is applied to each pressurization equipment (minimum 200 μm coverage) as these are offshore equipment.
- Calibration of SRV as per N49L standards and initial compliance.
- Delivering all documentation, including Certificates and Calculation Summaries.
Oxygen Booster Pump Trolley For Hindustan Aeronautics Limited (HAL)
Client Requirements:
- Design and deliver a high-performance oxygen charging trolley booster pump for safe and efficient oxygen transfer at elevated pressures.
- Strict adherence to safety regulations, precision engineering, and detailed documentation as per tender specifications.
- Complete project delivery within 12 weeks, including prototype/model submission and certification.
Our Work:
- Engineered a custom oxygen booster pump system with fail-safe mechanisms for high-pressure oxygen handling.
- Ensured 100% compliance with HAL’s stringent technical and safety standards.
- Prepared and submitted all required documentation, including test reports, design validations, and operational manuals.
Key Achievements:
- On-time delivery of the fully functional system within the 12-week deadline.
- Successful handover of the prototype/model as per HAL’s exact specifications.
- Recognized for flawless execution, accuracy in paperwork, and zero deviations from tender
Client satisfaction:
- Strengthened JK’s reputation as a trusted partner for high-pressure aerospace systems.
20 ft Machinery Container
Project Name:
- Manufacturing & Inspection of 20 ft Machinery Container
Client Name:
- Amphitrite Subsea Engg Pvt. Ltd.
Description:
- 20 ft Machinery container with a dedicated workspace inside the container
- 3 Compressor LP & HP
- High Quality Stainless Steel 2 Nos. Receiver Tank 500+500 ltr
- 18 Cylinder Breathing Cylinder Quad
- Dedicated Electrical Panel with all safety measures
- Submission of Testing & Commissioning Documents all as per IMCA standard
Covid Project
Location
- Savalram, Dombivili
- Art Gallery, Kalyan
- Asara Foundation, Kalyan
Project Name:
- SITC of 1000 Ltr Tank
- Liquid Cylinder Manifold
- Cryogenic Vaporizer
Description:
- 4-line liquid manifold system with safety equipment.
- 1000 liters High Grade Stainless Steel tank for medical gas storage
- Supply of the above items to Kalyan Dombivili Municipal Corporation (KDMC) Hospitals during the Global Pandemic (COVID-19)
- Submission of Documents such as Test Reports, Material Inspection Reports, and Pressure report signed by a Medical Officer as per requirement